BEV3 Upper Tie Bar (Base)
- Area: 220 m2
- Geo Stations: 5
- Inspection Stations: 1GMAW Stations: 1
- Respot Stations: 2
- Qty Spot Robots: 5
- Qty MH Robots: 3
- Qty Combo Robots: 1Qty MIG Robots: 1
Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation
Layout BEV (4 MODEL IN SAME CELL WITH CART TOOLINGS.

L233 Toolings


C234 Toolings


R233 Toolings


S233 Toolings


Final Layout UTB BEV3

Equipment IncreaseadArea:
- Area: +182 m2
- Geo Stations: +2
- GMAW Stations: +1
- Respot Stations: +
- 4Qty Spot Robots: +1
- Qty MH Robots: +3
Pony Line L234/S233

Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation
Mainstream


Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation
Mainstream

Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment
- Cycle Time Validation
Mainstream

Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line
Assembly - PLC Programming
- Robot Programming
- Tooling Adjustment
- Cycle Time Validation
Urea CM (Stellantis)

Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment
- Cycle Time Validation
MIG: 5187 mm/30 seams
- Geo Stations: 4
- Reweld Staions: 3
- Inspection Station: 1
- Rework Station: 1
- Qty MIG Robots: 9
- Qty MH Robots: 2
- Qty Inspection Robots: 1
Magna Mecanismos Cushion
Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation

Magna Mecanismos Back
Project Scope:
- Process Design
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation

Isringhausen
Project Scope:
- Process Simulation
- Tooling Design
- Machining & Assembly
- Tooling Certification
- Production Line Assembly
- PLC Programming
- Robot Programming
- Tooling Adjustment • Cycle Time Validation


Turnkey Project
“EV” Fender assembly
cell full integration
- 2x Robots
- Design & Process Simulation
- Build & Install
- PLC
- Robotics



Install of complete Weld
(Body) Shop including
main feeds
Full install weld shop at
main body (52, 750 sq ft)
- 4x Mezzanine
- 40x Robots
- 18x WPP
- 22x CDP

Install of complete Weld
(Body) Shop including
main feeds
Full install weld shop at
shell body (43,000 sq ft)
- 6x Hem Presses
- 24x Robots
- 12x WPP
- 15x CDP

Design & Automation
Ford Motor Company
Automatic Fixture to install Rear Suspension
Goal was to change from manual operation to be
fully automated.
Battery load and Unload cell
Goal was to change from manual operation to be
fully automated.