Main Projects
imagen de titulo
In the last 2 years we installed more than 500 robots with excellent performance and improving the timing proposal. Getting customer satisfaction is our principal objective.

BEV3 Upper Tie Bar (Base)

  • Area: 220 m2
  • Geo Stations: 5
  • Inspection Stations: 1GMAW Stations: 1
  • Respot Stations: 2
  • Qty Spot Robots: 5
  • Qty MH Robots: 3
  • Qty Combo Robots: 1Qty MIG Robots: 1

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Layout BEV (4 MODEL IN SAME CELL WITH CART TOOLINGS.


L233 Toolings


C234 Toolings


R233 Toolings


S233 Toolings


Final Layout UTB BEV3

Equipment IncreaseadArea:

  • Area: +182 m2
  • Geo Stations: +2
  • GMAW Stations: +1
  • Respot Stations: +
  • 4Qty Spot Robots: +1
  • Qty MH Robots: +3

Pony Line L234/S233

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Mainstream

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Mainstream

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment
  • Cycle Time Validation

Mainstream

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line
    Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment
  • Cycle Time Validation

Urea CM (Stellantis)

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment
  • Cycle Time Validation

MIG: 5187 mm/30 seams

  • Geo Stations: 4
  • Reweld Staions: 3
  • Inspection Station: 1
  • Rework Station: 1
  • Qty MIG Robots: 9
  • Qty MH Robots: 2
  • Qty Inspection Robots: 1

Magna Mecanismos Cushion

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Magna Mecanismos Back

Project Scope:

  • Process Design
  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Isringhausen

Project Scope:

  • Process Simulation
  • Tooling Design
  • Machining & Assembly
  • Tooling Certification
  • Production Line Assembly
  • PLC Programming
  • Robot Programming
  • Tooling Adjustment • Cycle Time Validation

Turnkey Project

“EV” Fender assembly
cell full integration

  • 2x Robots
  • Design & Process Simulation
  • Build & Install
  • PLC
  • Robotics
Facility:
Magna SFT
City:
Hermosillo, Sonora
Year:
2018

Install of complete Weld
(Body) Shop including
main feeds

Full install weld shop at
main body (52, 750 sq ft)

  • 4x Mezzanine
  • 40x Robots
  • 18x WPP
  • 22x CDP
Facility:
Toyota Manufacturing of Mexico
City:
Apaseo el Grande, Guanajuato
Year:
2018 – 2019 – 6
months (current)

Install of complete Weld
(Body) Shop including
main feeds

Full install weld shop at
shell body (43,000 sq ft)

  • 6x Hem Presses
  • 24x Robots
  • 12x WPP
  • 15x CDP
Facility:
Toyota Manufacturing of Mexico
City:
Apaseo el Grande, Guanajuato
Year:
2018 – 2019 – 6
months (current)

Design & Automation

Ford Motor Company

Automatic Fixture to install Rear Suspension

Goal was to change from manual operation to be
fully automated.

Battery load and Unload cell

Goal was to change from manual operation to be
fully automated.

Contact Us

Get In Touch

    facebookinstagram

    icono tel

    (+52) 844 869 2206
    (+52) 844 228 0909

    icono tel

    fernandofuentes@grupofx2.com
    emmanuelfuentes@grupofx2.com

    FX2 Copyright 2026